Copper Mtn Solar, Sempra And Obama’s Insourcing Problem

What short memories the President must think we have.

From FOX Nation:

President Obama will tout investments in “renewable” energy Wednesday at the local Copper Mountain Solar 1 plant, although the plant has only five full-time employees.
The plant, owned by San Diego-based energy company Sempra, was built in late 2010 at a cost of $141 million. Funding included $42 million in federal-government tax credits and $12 million in tax-rebate commitments from the state of Nevada.

Flashback to July 2011 and Sempra Energy, who owns Copper Mountain Solar:

According to a recent report, Sempra Energy’s plan to offshore green energy production to Mexico would result in as many as 15,000 lost U.S. jobs and nearly $300 million in lost local, state and federal tax revenue. 90% of the direct job losses would occur in Imperial County, which had the highest unemployment rate in the nation as of April 2011 at 27.9%

The study, “Should Green Jobs Be Outsourced: A Case Study of Lost Jobs and Lost Opportunities,” was authored by Dr. Peter Philips, Professor of Economics at the University of Utah.

Related Posts:

Green Is Good

New Green Fuel Source: Desperation

New Green Fuel Source Follow-up

Obama’s Idea of Insourcing

About A.P. Dillon

A.P. Dillon is a freelance journalist and is currently writing at The North State Journal. She resides in the Triangle area of North Carolina. Find her on Twitter: @APDillon_
This entry was posted in Economy, Obama, The Articles and tagged , , , , , . Bookmark the permalink.